SCS Home > Our Schools > Capital Projects > St. David Construction



In 2006, the existing St. David School was deemed, "Prohibitive to Repair" and the Sudbury Catholic District School Board conducted an accommodation review in 2009-2010. It was concluded the school should be closed, and a new school constructed within the existing catchment area.  The Ministry of Education approved the construction of the new facility on July 7, 2011.  After this approval was received, a request for proposal for Architectural Services was issued, with Yallowega Belanger Architecture being awarded the contract. Construction documents were issued for tender on May 22, 2014 and the tender closed on June 23, 2014. On June 24th, trustees approved the tender value and construction of the new school . The construction was awarded to Niacon Ltd. Construction is currently ongoing.


Project Photo Album

See the latest project photos in the St. David Construction Photo Album


Construction Cam


See the latest shapshot of the construction site updated throughout the day, and look back at the progress from the beginning!

View the constuction camera full screen

See archived collection from 10/23 through 11/25 (orignal camera position)




Sudbury's newest green elementary school will include:


Architectural

  • High Performance Building Envelope (Insulation Value)
  • High Performance Windows
  • Rubber floors (no stripping/waxing)
  • Low Emitting Materials Adhesive and Sealants (Paints and Coatings)
  • Low Emitting Materials composite Wood and Laminate Adhesives (no formaldehyde)


Mechanical

  • High Efficiency Air-to-Air Heat Recovery Ventilation Systems
  • Displacement Ventilation
  • High Efficiency Condensing Boilers
  • High Efficiency Condensing Hot Water Heaters
  • Ultra-low Flow Urinals
  • Low-flow / Hands free Faucets
  • Provisions for rainwater harvesting
  • In-floor Heating (allows boilers to operate at lower temperatures for improved performance in high efficiency condensing mode)
  • Integrated Building Management System for HVAC Controls (allows for optimizing operating parameters and schedules to minimize energy use)


Electrical

  • LED Lighting throughout building
  • Design exceeds ASHRAE 90.1 requirements
  • Occupancy Sensors to Control Interior Lighting (utilizing dimming and scheduling)
  • Exterior LED Lighting
  • Energy Metering
  • Provisions for Future Solar Panels

 


 






YALLOWEGA BELANGER ARCHITECTURE  (YB) is proud and excited to have been selected as architects for the new Holy Cross Catholic Elementary School as well as the addition to St. Benedict Catholic Secondary School in the city’s south end. Learn more...

 

NIACON LIMITED was founded in the rapidly expanding hospitality industry in and around the Niagara peninsula in 1989, and is based around the principal of providing quality construction to clients building exciting projects. Learn more...

 

Board Motion - March 18, 2014
Letter to families - June 2, 2014
Board Motion - June 24, 2014
Board Motion - June 24, 2014 (Amendment)

 

 

 

 